Construction

Construction

Job sites sprawl. Crews lose hours crossing them.

On a large site, the walk between the trailer, the gang box, and the work face repeats all day — usually carrying something. TexTrack™ keeps workers and materials moving so more of the shift goes to building.

The problem

The trip is longer than a walk and lighter than a pallet

Site logistics fall into a gap. A telehandler or forklift is the wrong tool for a toolbag and a box of fittings, and tying one up for a small run is expensive. So the trip happens on foot, several times a day, per trade. Multiply that across a crew and a schedule and it is real money and real fatigue.

350 lb of tools and material

Enough for a tool crib run, a fittings delivery, or a two-man kit — without pulling a lift off its task.

Aluminum frame

Anti-corrosion aluminum construction handles yard, dock apron, and mixed indoor-outdoor site travel.

Swappable battery

The 48V pack with UL-rated cells lifts out, so a spare covers a full day without waiting on a charger.

Where it runs

Common uses on site

  • Tool crib and gang box runs to the work face
  • Material and fittings delivery across large footprints
  • Superintendent and foreman rounds between zones
  • Safety walks and inspection routes
  • Punch list and closeout work across finished areas
  • Moving between trailers, laydown yards, and the building
Worth confirming

Site conditions matter

This is built for firm, reasonably level surfaces — finished slab, dock aprons, compacted haul roads, and paved areas. It is not a rough-terrain vehicle. Tell us the surfaces and grades you are working across and we will be straight with you about whether it fits before you buy.

Tell us the site

Send the footprint, the surfaces, and what your crews are carrying. We'll spec a configuration and quote it.

Request a quoteStart a paid pilot